To meet the growing market needs, an extension project of the port depot in Nouakchott began in June 2022. It consists of the construction of:
-
A 600,350 cf (17,000 cubic meters) diesel tank.
-
A 123,600 cf (3,500 cubic meters) fuel oil tank.
-
A 88,287 cf (2,500 cubic meters) gasoline tank.